
AR RACKING
AR Racking begins construction of JYSK's large logistics hub in Spain
The project will have more than 182,500 pallet positions and 20 stacker cranes.
At AR Racking, we have begun construction of the two clad-rack warehouses for JYSK’s new distribution centre in Almenara, Castellón. This is a landmark logistics project in Europe due to its scale, level of automation and capacity to support the company’s growth in Southern Europe and North Africa.
Following JYSK’s groundbreaking ceremony a few weeks ago, we began our work on site in early April. We are currently carrying out the anchoring phase, the first step in the construction of the clad-rack structures, which will progress from the summer with the assembly of the full structure.
We were selected to design, manufacture and install a customised industrial storage solution comprising two high-bay clad-rack warehouses with capacity for 182,500 pallet positions, managed by 20 stacker cranes. This solution will maximise the capacity of the new centre and ensure automated, efficient and reliable long-term operations.
We were selected to design, manufacture and install a customised industrial storage solution comprising two high-bay clad-rack warehouses with capacity for 182,500 pallet positions, managed by 20 stacker cranes. This solution will maximise the capacity of the new centre and ensure automated, efficient and reliable long-term operations.
JYSK’s logistics centre, located on a 274,000 m² site, will also house JYSK’s new head offices for Spain and Portugal. Its commissioning is scheduled for 2027/2028 and it will create employment for approximately 250 people.
With the start of this project, we reinforce our leadership in large-scale automated logistics projects and our commitment to innovative, robust industrial storage solutions designed to support the expansion of growing international companies.
https://www.ar-racking.com/en/news/we-begin-construction-of-jysks-new-logistics-project-with-more-than-182000-pallet-positions/
Other news

New boost to the EMEA market with the addition of Jaime Domingo at AR Racking
New RAM EMEA integration at the Zamudio offices

More than 2 million people have already seen the inside of AR Racking's automated factory
Our FPV drone videos show the inside of the automated plant in Tudela (Navarra).

AR Racking updates its carbon footprint verification
DNV has verified the 2025 Carbon Footprint Report in accordance with the UNE EN ISO 14064-1:2019 standard.

AR Racking optimizes the new warehouse of Santo Domingo Logística
12,300 pallet positions with AR SHUTTLE in Segovia.

We increased the capacity of Natucer (Pamesa Business Group) with AR PAL shelving in Castellón
• Phased remodeling in 8 weeks and design at different heights to take advantage of a building with a gabled roof.

SQRUPS multiplies its logistics capacity with AR Racking
New logistics center with 10,844 storage locations in Madrid.

AR Racking launches AR LS galvanized for picking
Improved durability thanks to galvanized steel in the struts.

TOURON optimizes its new warehouse with a customized solution from AR Racking
Complete installation in just 7 weeks in Torrejón de Ardoz (Madrid).