
AR RACKING
AR Racking updates its carbon footprint verification
DNV has verified the 2025 Carbon Footprint Report in accordance with the UNE EN ISO 14064-1:2019 standard.
AR Racking has updated the verification of its Organizational Carbon Footprint for the 2025 calendar year, reinforcing its commitment to rigorous, transparent environmental management and continuous improvement.
The audit, carried out by DNV in April 2026, was conducted in accordance with UNE EN ISO 14064-1:2019. The verified report covers the company’s direct emissions, indirect emissions from imported energy and other indirect emissions associated with transport, as well as the products and services used by the company.
With this new verification, AR Racking strengthens the traceability of its environmental information and consolidates a line of work the company had already been developing in previous years. Measuring and verifying the carbon footprint makes it possible to move forward with validated data, identify areas for improvement and support decision-making in sustainability matters.
This update forms part of AR Racking’s strategy to continue offering high-quality, innovative industrial storage solutions aligned with the market’s new environmental requirements. The company continues to move towards a more efficient, responsible industrial model, prepared to respond to the climate challenges facing the logistics sector.
https://www.ar-racking.com/en/news/we-update-our-2025-carbon-footprint-verification/
Other news

New boost to the EMEA market with the addition of Jaime Domingo at AR Racking
New RAM EMEA integration at the Zamudio offices

AR Racking begins construction of JYSK's large logistics hub in Spain
The project will have more than 182,500 pallet positions and 20 stacker cranes.

More than 2 million people have already seen the inside of AR Racking's automated factory
Our FPV drone videos show the inside of the automated plant in Tudela (Navarra).

AR Racking optimizes the new warehouse of Santo Domingo Logística
12,300 pallet positions with AR SHUTTLE in Segovia.

We increased the capacity of Natucer (Pamesa Business Group) with AR PAL shelving in Castellón
• Phased remodeling in 8 weeks and design at different heights to take advantage of a building with a gabled roof.

SQRUPS multiplies its logistics capacity with AR Racking
New logistics center with 10,844 storage locations in Madrid.

AR Racking launches AR LS galvanized for picking
Improved durability thanks to galvanized steel in the struts.

TOURON optimizes its new warehouse with a customized solution from AR Racking
Complete installation in just 7 weeks in Torrejón de Ardoz (Madrid).