
AR RACKING
AR Racking optimizes the new warehouse of Santo Domingo Logística
12,300 pallet positions with AR SHUTTLE in Segovia.
AR Racking has completed a new project for Santo Domingo Logística with the installation of the AR Shuttle system at its new warehouse in Segovia, designed to increase storage capacity without compromising operational agility.
The solution enables 12,300 pallet positions in a total area of 7,400 m², helping to organise the growth of the centre and to work with greater foresight day-to-day.
Santo Domingo Logística chose AR Shuttle because it is a semi-automated compact system, a combination designed to increase capacity and maintain a stable workflow when operations demand speed and control.
The installation incorporates specific requirements of the project, such as a working environment with a height of 12 metres and configuration for European pallets, adjusting the solution to real operational needs.
Borja Oroz, Operations Director at SDLOG Santo Domingo Logística: “We needed more capacity and more organised operations. With the AR Shuttle solution, we gain useful space and a more consistent work dynamic.”
Beatriz Villalta, Project Manager at AR Racking: “The goal was clear: a compact, reliable and quick-to-implement solution, designed to accompany the growth of the warehouse from day one.”
https://www.ar-racking.com/en/news/we-install-ar-shuttle-for-santo-domingo-logistica-in-segovia/
Other news

New boost to the EMEA market with the addition of Jaime Domingo at AR Racking
New RAM EMEA integration at the Zamudio offices

AR Racking begins construction of JYSK's large logistics hub in Spain
The project will have more than 182,500 pallet positions and 20 stacker cranes.

More than 2 million people have already seen the inside of AR Racking's automated factory
Our FPV drone videos show the inside of the automated plant in Tudela (Navarra).

AR Racking updates its carbon footprint verification
DNV has verified the 2025 Carbon Footprint Report in accordance with the UNE EN ISO 14064-1:2019 standard.

We increased the capacity of Natucer (Pamesa Business Group) with AR PAL shelving in Castellón
• Phased remodeling in 8 weeks and design at different heights to take advantage of a building with a gabled roof.

SQRUPS multiplies its logistics capacity with AR Racking
New logistics center with 10,844 storage locations in Madrid.

AR Racking launches AR LS galvanized for picking
Improved durability thanks to galvanized steel in the struts.

TOURON optimizes its new warehouse with a customized solution from AR Racking
Complete installation in just 7 weeks in Torrejón de Ardoz (Madrid).