
AR RACKING
We increased the capacity of Natucer (Pamesa Business Group) with AR PAL shelving in Castellón
• Phased remodeling in 8 weeks and design at different heights to take advantage of a building with a gabled roof.
In AR Racking we have completed the remodelling of the warehouse of NATUCER (Pamesa Grupo Empresarial) in Onda (Castellón) with a very specific goal: to increase storage capacity without losing operational continuity. In the ceramics sector, every metre counts and every movement must keep pace with production, so the project was focused on gaining usable space in an orderly and practical way.
The solution chosen was our AR PAL adjustable pallet racking system, a classic pallet storage system due to its balance between capacity and direct access. With this installation, the warehouse has 10,822 pallet positions, designed for loads of 1,500 kg per pallet, providing a solid base for more efficient stock management and seamless operations.
The system has been configured for 800 x 1,200 mm and 1,000 x 1,200 mm pallets, with a height of 1,050 mm. We have also designed the structure to store two pallets per level, incorporating three supports per pallet: a technical detail offered by AR Racking for storing unit loads with different depths. Necessary for proper support resulting in greater safety, more stability, better support and peace of mind in daily use.
The biggest challenge was the building itself: a remodelled old warehouse with a gable roof. To turn this constraint into an advantage, we designed linear units at different heights (5,500 mm, 7,000 mm and 8,000 mm), making the most of the available volume and maximising the capacity without congesting the space. The result is a warehouse that not only increases its capacity, but also does so in a manner consistent with the actual geometry of the warehouse.
The project was completed in 8 weeks, validating the work in phases so that Natucer could continue to use the warehouse during assembly, freeing up space in other areas as the installation progressed. We also planned the delivery of material in phases meeting the agreed deadlines (3 weeks) and adapting to the customer’s operational needs during the project.
https://www.ar-racking.com/en/news/we-increase-the-capacity-of-natucer-pamesa-grupo-empresarial-with-ar-pal-racking-in-castellon/
Other news

New boost to the EMEA market with the addition of Jaime Domingo at AR Racking
New RAM EMEA integration at the Zamudio offices

AR Racking begins construction of JYSK's large logistics hub in Spain
The project will have more than 182,500 pallet positions and 20 stacker cranes.

More than 2 million people have already seen the inside of AR Racking's automated factory
Our FPV drone videos show the inside of the automated plant in Tudela (Navarra).

AR Racking updates its carbon footprint verification
DNV has verified the 2025 Carbon Footprint Report in accordance with the UNE EN ISO 14064-1:2019 standard.

AR Racking optimizes the new warehouse of Santo Domingo Logística
12,300 pallet positions with AR SHUTTLE in Segovia.

SQRUPS multiplies its logistics capacity with AR Racking
New logistics center with 10,844 storage locations in Madrid.

AR Racking launches AR LS galvanized for picking
Improved durability thanks to galvanized steel in the struts.

TOURON optimizes its new warehouse with a customized solution from AR Racking
Complete installation in just 7 weeks in Torrejón de Ardoz (Madrid).